Showing posts with label HOOVER DAM. Show all posts
Showing posts with label HOOVER DAM. Show all posts

3 September 2016 - HOOVER DAM




HOOVER DAM

G'day folks,

Hoover Dam, once known as Boulder Dam, is a concrete arch-gravity dam in the Black Canyon of the Colorado River, on the border between the U.S. states of Nevada and Arizona.


In the early 20th century, the U.S. Bureau of Reclamation devised plans for a massive dam on the Arizona-Nevada border to tame the Colorado River and provide water and hydroelectric power for the developing Southwest. Construction within the strict timeframe proved an immense challenge, as the crew bored into carbon monoxide-choked tunnels and dangled from heights of 800 feet to clear canyon walls. The largest dam in the world at the time of its completion in 1935, this National Historic Landmark stores enough water in Lake Mead to irrigate 2 million acres and serves as a popular tourist destination.

At the turn of the 20th century, farmers sought to divert the Colorado River to budding Southwestern communities via a series of canals. When the Colorado broke through the canals in 1905, creating the inland Salton Sea, the job of controlling the raging river fell to the U.S. Bureau of Reclamation.

Bureau director Arthur Powell Davis in 1922 outlined a plan before Congress for a multipurpose dam in Black Canyon, located on the Arizona-Nevada border. Named the Boulder Canyon project, after the original proposed site, the dam would not only control flooding and irrigation, it would generate and sell hydroelectric power to recoup its costs. Still, the proposed $165 price tag concerned some lawmakers, while representatives of six of the seven states in the river drainage area—Colorado, Wyoming, Utah, New Mexico, Arizona and Nevada —worried that the water would primarily go to California.



Secretary of Commerce Herbert Hoover brokered the 1922 Colorado River Compact to divide the water proportionally among the seven states, but the legal wrangling continued until outgoing President Calvin Coolidge authorized the Boulder Canyon Project in December 1928. In honor of the new president’s contributions, Secretary of the Interior Ray L. Wilbur announced the structure would be called Hoover Dam at a 1930 dedication ceremony, though the name didn’t become official until 1947.

As the Great Depression unfolded, hopeful laborers descended on Las Vegas and set up camp in the surrounding desert for the chance to work on the project. Those who were hired eventually moved to Boulder City, a community specifically built six miles from the work site to house its employees. Meanwhile, the U.S. government set about finding a contractor to build the proposed 60-story arch dam. The contract was awarded in March 1931 to Six Companies, a group of construction firms that had pooled its resources to meet the steep $5 million performance bond.

The first difficult step of construction involved blasting the canyon walls to create four diversion tunnels for the water. Facing strict time deadlines, workers toiled in 140-degree tunnels choked with carbon monoxide and dust, conditions that prompted a six-day strike in August 1931. When two of the tunnels were complete, the excavated rock was used to form a temporary coffer dam that successfully rechanneled the river’s path in November 1932.
The second step of involved the clearing of the walls that would contain the dam. Suspended from heights of up to 800 feet above the canyon floor, high scalers wielded 44-pound jackhammers and metal poles to knock loose material, a treacherous task that resulted in casualties from falling workers, equipment and rocks.



Meanwhile, the dried riverbed allowed for construction to begin on the power plant, four intake towers and the dam itself. Cement was mixed onsite and hoisted across the canyon on one of five 20-ton cableways, a fresh bucket capable of reaching the crews below every 78 seconds. Offsetting the heat generated by cooling concrete, nearly 600 miles of pipe loops were embedded to circulate water through the poured blocks, with workers continually spraying the concrete to keep it moist.

As the dam rose, block by block, from the canyon floor, the visual renderings of architect Gordon Kaufmann took form. Electing to emphasize the imposing mass of the structure, Kaufmann kept the smooth, curved face free of adornment. The powerplant was given a futuristic touch with horizontal aluminum fins for windows, while its interior was designed to pay homage to Native American cultures.



With the body of water that would become Lake Mead already beginning to swell behind the dam, the final block of concrete was poured and topped off at 726 feet above the canyon floor in 1935. On September 30, a crowd of 20,000 people watched President Franklin Roosevelt commemorate the magnificent structure’s completion. Approximately 5 million barrels of cement and 45 million pounds of reinforcement steel had gone into what was then the tallest dam in the world, its 6.6 million tons of concrete enough to pave a road from San Francisco to New York City. Altogether, some 21,000 workers contributed to its construction.

Hoover Dam fulfilled the goal of disseminating the one-wild Colorado River through the parched Southwest landscape, fuelling the development of such major cities as Los Angeles, Las Vegas and Phoenix. Capable of irrigating 2 million acres, its 17 turbines generate enough electricity to power 1.3 million homes. The dam was designated a National Historic Landmark in 1985 and one of America’s Seven Modern Civil Engineering Wonders in 1994. It receives some 7 million visitors annually, while Lake Mead, the world’s largest reservoir, hosts another 10 million as a popular recreation area.
 

Clancy's comment: We have built massive things like this in Australia, but not for a while. Sadly, our politicians lack vision.

I'm ...










 

3 March 2014 - HOOVER DAM


HOOVER DAM

G'day folks,

Welcome to a damn whopping dam - HOOVER DAM. I live very close to a similar dam so this particular structure interests me.

Hoover Dam, once known as Boulder Dam, is a concrete arch-gravity dam in the Black Canyon of the Colorado River, on the border between the US states of Arizona and Nevada. It was constructed between 1931 and 1936, and was dedicated on September 30, 1935, by President Franklin Roosevelt. Its construction was the result of a massive effort involving thousands of workers, and cost over one hundred lives.

Since about 1900, the Black Canyon and nearby Boulder Canyon had been investigated for their potential to support a dam that would control floods, provide irrigation water and produce hydroelectric power. In 1928, Congress authorized the project. The winning bid to build the dam was submitted by a consortium called Six Companies, Inc., which began construction on the dam in early 1931. Such a large concrete structure had never been built before, and some of the techniques were unproven. The torrid summer weather and the lack of facilities near the site also presented difficulties. Nevertheless, Six Companies turned over the dam to the federal government on March 1, 1936, more than two years ahead of schedule.

Hoover Dam impounds Lake Mead, and is located near Boulder City, Nevada, a municipality originally constructed for workers on the construction project, about 25 mi (40 km) southeast of Las Vegas, Nevada. The dam's generators provide power for public and private utilities in Nevada, Arizona, and California. Hoover Dam is a major tourist attraction, and U.S. 93, a heavily travelled road, runs along its crest. In late 2010, through traffic is scheduled to be rerouted onto a bypass presently under construction, and the dam roadway will be restricted to use by visitors.




 Excavation for the powerhouse was carried out simultaneously with the excavation for the dam foundation and abutments. Excavation for the U-shaped structure located at the downstream toe of the dam was completed in late 1933 with the first concrete placed in November 1933. Filling of Lake Mead began February 1, 1935 even before the last of the concrete was poured that May. The powerhouse was one of the projects uncompleted at the time of the formal dedication on September 30, 1935—a crew of 500 men remained after the dedication to finish it and other structures. To make the roof of the powerhouse proof against bombs, it was constructed of layers of concrete, rock, and steel with a total thickness of about 3.5 feet (1.1 m), topped with layers of sand and tar.

The agreement whereby the government accepted the dam from Six Companies included a provision allowing the Bureau of Reclamation to use Six Companies-owned machinery in the canyon for seven months to allow for the installation of additional powerhouse equipment. In the last half of 1936, water levels in Lake Mead were high enough to permit power generation, and the first three generators, all on the Nevada side, began operating. In March 1937, one more Nevada generator went online and the first Arizona generator by August. By September 1939, four more generators were operating and the dam's power plant became the largest hydroelectricity facility in the world. 




The final generator was not placed in service until 1961, bringing the maximum generating capacity to 1345 megawatts at the time. Original plans called for 16 large generators, eight on each side of the river, but two smaller generators were installed instead of one large one on the Arizona side for a total of 17. The smaller generators were used to serve smaller municipalities at a time when the output of each generator was dedicated to a single municipality, before the dam's total power output was placed on the grid and made arbitrarily distributable. The present contracts for the sale of electricity expire in 2017.

Before water from Lake Mead reaches the turbines, it enters the intake towers and enters four gradually narrowing penstocks which funnel the water down towards the powerhouse. The intakes provide a maximum hydraulic head (water pressure) of 590 ft (180 m) as the water reaches a speed of about 85 mph (140 km/h). The entire flow of the Colorado River passes through the turbines. The spillways and outlet works (jet-flow gates) are rarely used. Following an uprating project from 1986 to 1993, the total gross power rating for the plant, including two 2.4 megawatt electric generators that power Hoover Dam's own operations is a maximum capacity of 2080 megawatts. The annual generation of Hoover Dam varies. The maximum net generation was 10.348 TWh in 1984, and the minimum since 1940 was 2.648 TWh in 1956. The average has been about 4.2 TWh/year.


Control of water was the primary concern in the building of the dam. Power generation has allowed the dam project to be self-sustaining: proceeds from the sale of power repaid the 50-year construction loan, and those revenues also finance the multi-million dollar yearly maintenance budget. Power is generated in step with and only with the release of water in response to downstream water demands. Lake Mead and downstream releases from the dam provide water for both municipal and irrigation uses. Water released from the Hoover Dam eventually reaches the All-American Canal for the irrigation of over 1,000,000 acres (400,000 ha) of land. Water from the lake serves 8 million people in Arizona, Nevada and California.

The changes in water use caused by Hoover Dam's construction had an impact on the Colorado River Delta. The construction of the dam has been credited as causing the decline of this estuarine ecosystem. For six years, after the construction of the dam and while Lake Mead filled, virtually no water reached the mouth of the river. The delta's estuary, which once had a freshwater-saltwater mixing zone stretching 40 miles (64 km) south of the river's mouth, was turned into an inverse estuary where the level of salinity was actually higher closer to the river's mouth.



The Colorado River had experienced natural flooding before the construction of the Hoover Dam. The dam eliminated the natural flooding, which imperiled many species adapted to the flooding, including both plants and animals. The construction of the dam decimated the populations of native fish in the river downstream from the dam. Four species of fish native to the Colorado River, the Bonytail chub, Colorado pikeminnow, Humpback chub, and Razorback sucker, are currently listed as endangered.
  

Clancy's comment:  Structures like this always amaze me, especially when you consider what little technology they had at the time. I take my hat off to them.

I'm ...










Think about this!